dinsdag 27 januari 2015

Gearbox disassembled

In the last few days, I have been disassembling the gearbox. Inside and gears seem to be in very good shape, however the oil was very sluggish from aging. Gasket set is received, as well as other oil seals, so when I am finished cleaning the lot, disassembly can start. Overhauling doesn't seem necessary but I will do some measuring later. New clutch cylinder set and clutch set are waiting also








New parts ...... waiting.

After a little bit of cleaning.......



Well..... this should be interesting......

First results after cleaning, sandblasting, rinsing and painting;

Starting to look pretty good, right? Almost finished! 

zondag 4 januari 2015

Disassembly finished and metalwork officially started

With the removal of the two doors and the steering column, I can really say that disassembly is finished (well, apart from the wheels and suspension). Meanwhile metalwork also has started. I decided to work on the bottom and rocker panels first to bring back some strength and structure back in the body. If you're gonna start, why not start at the bottom......

Taking out the doors was a great hassle. The hinges were totally stuck and Ghia didn't really 'design for disassembly'. On both sides of the car, one of the hinges had to be cut with the angle grinder.

From the bottom, I had already spotted a rotted out cross member under the drivers seat. This will have my first attention. Cutting it out was a bit scary, beause it's a very fundamental part. 


At a nearby restoration company, I had a repair piece made for the cross member. This has been tacked in place first. Also a repair piece on the side of the center tunnel has been welded in. 


Then I started making a floorpan-rear section. Ghia has left the original front section of the Fiat 1500-floorboards in place and used a new, flat piece of sheetmetal to close the rear-end.

And made 'some' holes in the floorpan, which I will be using later to spotweld the floorpan in place. 

Now, what to do with the inner rocker panel; 
I was hoping I could save the original one, but it appears to be in pretty bad shape. This will also give me the opportunity to work inside the rocker box. I am not very enthusiastic about how Ghia constructed this. There seem to be 4 (!) sheets of metal welded over eachother. I think some obsolete sheetmetal of the Fiat 1500 Berlina was left behind during mass-production.


 I have made a sketch for the structure, the way I want it to be.


looking good:



zaterdag 13 december 2014

Engine disassembled




State of the engine is not looking too bad. cylinder no.2 was rusted and a few piston rings were broken. Time for a thorough re-assembly, including re-honing of the cylinders, balancing the crankshaft and replacing all the bearings. this will make a nice project, when it's too cold to work on the body. 

In the meantime, the bare engine block has been dropped of at the revision company for extensive research. They told me there are no big issues, so I will have all the cylinders rebored for oversize new pistons (77.2). A new oil pan came in today because the old one lost a 'head-to-head' with a speed bump. 

Gasket set and new piston set (77.2 oversized) are waiting for re-assembly. All kinds of engine parts will come in later this week. Pictures of re-assembly will appear here later. First wait for the engine block to get back after re-boring the cylinders



27-2-2015: After cleaning the engine, drilling and honing the cylinders and grinding the mating surface, this is what the engine block looks like. I like it. Can't wait to paint and reassemble......




dinsdag 11 november 2014

Wiring out.

November 9th: Took out wiring harness





 
I hope I made enough pictures to get it in again. :-)